Quality Assurance

Quality Control Before Your Products Leave China

Daro coordinates inspection and documentation against approved specifications before shipment.

Send Your BOQ
Independent Quality Control for Project ProcurementREAL PHOTO REQUIRED: QC and inspection

Why QC Matters

Control the details before dispatch

Multi-supplier projects and custom products demand checks against agreed specifications, finish consistency, dimensions, packing and quantities.

  • Multiple suppliers
  • Custom products
  • Finish consistency
  • Dimensions
  • Packing
  • Quantity
  • Specification compliance

Pre-production Checks

Confirm the approved reference

Daro coordinates the review of drawings, materials, color and finish, dimensions, hardware and sample confirmation before production proceeds.

  • Approved drawings
  • Materials
  • Color and finish
  • Dimensions
  • Hardware
  • Sample confirmation

In-Process Inspection

Follow production as issues arise

Track production progress and workmanship against the approved specification. Identify issues early and coordinate corrective follow-up with the supplier.

  • Production progress
  • Workmanship
  • Specification checks
  • Issue identification
  • Corrective follow-up
Measurement and workmanship checkREAL PHOTO REQUIRED: measurement and inspection

Pre-Shipment Inspection

Check before goods leave the supplier

Coordinate verification of the agreed quantity, dimensions, appearance, functions, packaging, labels and shipping marks.

  • Quantity
  • Dimensions
  • Appearance
  • Functions
  • Packaging
  • Labels
  • Shipping marks
Packaging reviewREAL PHOTO REQUIRED: packaging check

Evidence & Reporting

Document what was checked

Inspection photos, videos, issue records, packing photos and final approval records can support project review where required. Reporting is coordinated manually against the approved scope; no automated reporting system is claimed.

  • Inspection photos
  • Videos
  • Issue records
  • Packing photos
  • Final approval records

Issue Handling

Resolve issues before approval

  1. Issue found
  2. Supplier notified
  3. Correction
  4. Recheck
  5. Approval